Determination of Critical Path of the Project

Option #1: Determination of Critical Path of the Project
Use the following table to calculate duration (round to 0 decimal places)

(See attached screenshot of table)

Use Activity on Node to construct a network activity diagram with the preceding table.

(See attached screenshot of table)

Use the forward and backward pass method to calculate project duration, based on the assumption that the expected duration of each activity can be calculated using the following formula: Expected Duration = (Pessimistic Duration + 4 x Most Likely Duration + Optimistic Duration)/6. Include slack on the arrows and identify the critical path(s) and burst and merge activities.

Evaluate the finished project and write a review of your analysis and how you completed each step. Include the completed table and your AON diagram in your paper

Your response should be integrated in a well-written paper that meets the following requirements:

Be 2-3 pages in length, and must additionally contain graphical elements, placing these graphical elements in an appendix,

Be formatted according to APA 7th edition

Include two scholarly sources within the past 5 years

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more